Your planning baseline Use broad planning inputs only. Do not enter an address, medical record, password, account number, or equipment credential.
Housing stageCity / apartment Suburban home Rural home Homestead Household size Planning horizon72 hours 14 days 30 days 90 days Broad region (optional) Email for a saved private plan (optional)
Capability layers Choose the honest current state. A level 4 means tested redundancy with a second operator and a maintenance rhythm.
Water Stored water, filtration, and refill access 0 — Not in place 1 — Primary only 2 — Backup exists 3 — Tested and documented 4 — Redundant and practiced Critical power Safe power for lights, charging, and critical loads 0 — Not in place 1 — Primary only 2 — Backup exists 3 — Tested and documented 4 — Redundant and practiced Communications Contacts, charging, and backup connectivity 0 — Not in place 1 — Primary only 2 — Backup exists 3 — Tested and documented 4 — Redundant and practiced Food and cooking Rotating food and a no-utility cooking plan 0 — Not in place 1 — Primary only 2 — Backup exists 3 — Tested and documented 4 — Redundant and practiced Heat and shelter Weather protection and safe heat procedures 0 — Not in place 1 — Primary only 2 — Backup exists 3 — Tested and documented 4 — Redundant and practiced Medical and work continuity General continuity needs for work and care 0 — Not in place 1 — Primary only 2 — Backup exists 3 — Tested and documented 4 — Redundant and practiced Offline knowledge Printed or local procedures available without the cloud 0 — Not in place 1 — Primary only 2 — Backup exists 3 — Tested and documented 4 — Redundant and practiced Family operations Second operator, roles, and short drills 0 — Not in place 1 — Primary only 2 — Backup exists 3 — Tested and documented 4 — Redundant and practiced